A price per m² or a lump sum for the whole bathroom is a fixed price: it binds you even if the work takes longer (Art. 373 Swiss Code of Obligations, CO). Without a fixed price, you bill according to the value of the work and your expenses (Art. 374 CO). So quote the surfaces per m² and state in the quote that work on the substrate that only becomes visible after strip-out will be billed as daywork (Regie).
If you find defects in the substrate or in tiles the client supplied, you must tell the client straight away. Otherwise you bear the consequences yourself (Art. 365 para. 3 CO). You handle client-supplied materials with care and return what is left (Art. 365 para. 2 CO). Put the notice in the work report or send it by email, with a date and a photo.
There is no official hourly rate for tilers. Your daywork rate has to cover your wage and social security contributions, the hours for quotes and travel, your van, machines such as the wet saw and mixer, insurance and profit. You derive your m² price from it: time per m² times your hourly rate, plus adhesive, grout and cutting waste.
Floor layers and parquet layers separate on the invoice what the client wants to compare: supplying the flooring, laying per m², skirting boards per linear metre, sanding and sealing or oiling per m². Preparation such as levelling compound or removing the old floor goes in as separate lines.
According to SECO, the national CLA (L-GAV) for the tiling trade is declared generally binding until 31 December 2026. It does not cover the cantons of FR, BS, BL, VD, VS, NE, GE, TI and JU. The floor covering trade has its own CLA, which SECO lists as running until 31 December 2028. A CLA becomes relevant as soon as you employ people. Whether the tiling CLA has been extended for 2027 you can check in the CLA list on seco.admin.ch.
From CHF 100'000 annual turnover you must register for VAT (MWST/TVA, Art. 10 para. 2 let. a VAT Act). If you use the net tax rate method, the Federal Tax Administration ordinance (in force since 1 January 2025) distinguishes:
| Activity | Net tax rate |
|---|
| Tiling: supply with laying | 4.5% |
| Tiling: labour only (no materials) | 6.8% |
| Floor coverings / carpets: supply with laying | 3.7% |
| Parquet: supply with laying | 3.7% |
If you lay partly with your own materials and partly labour-only as a subcontractor, each activity with more than 10% of turnover gets its own rate (Art. 86 VAT Ordinance). More in VAT for freelancers.
For work on buildings, since 1 January 2026 the client has 60 days to report defects, and 60 days from discovery for hidden defects (Art. 367 para. 1bis and Art. 370 para. 4 CO). Claims expire five years after acceptance of the work (Art. 371 CO). The SIA 248 standard "Tiling work", like every SIA contract standard, only applies if it was agreed. Technical guidance on laying is published by the association Ceruniq, formerly the Swiss tile association (Schweizerischer Plattenverband).
Magic Heidi fits tilers, floor layers and grouting specialists who work alone or with a small team: bathroom renovations, kitchen splashbacks, parquet and vinyl in flats, re-grouting, subcontracting jobs. Quote, deposit, invoice, receipts and VAT are all in one place.
Magic Heidi is not built for taking measurements off plans, NPK bills of quantities, tile stock management or payroll for piece-rate workers. There is no offline mode for the basement with no signal. If you need that, construction software will serve you better.