Swiss-Made Software

Invoicing for excavation and equipment rental

Digger hours, excavation by measured quantity, tipping fees, interim invoices and machine hire as a QR-bill. For excavation contractors, demolition, skip hire, construction equipment rental and scrap metal recycling.

5'000+
Swiss self-employed
4.8★
App Store
30 sec.
First invoice in

What an excavation contractor's invoice looks like

In excavation and civil works, three kinds of line sit on the same invoice: machine hours, measured quantities, and costs you pass on such as haulage and tipping. The sample shows the excavation for an extension as a final invoice with one interim invoice already paid. All amounts are made-up examples, not guide prices.

ItemQtyRate (CHF)Amount (CHF)
Mobilisation: delivery and collection of 14 t tracked excavatorlump sum480.00
14 t tracked excavator with operator16 h165.002'640.00
Spoil removal, 4-axle tipper11 loads145.001'595.00
Tipping fee, clean excavated soil, as per weighbridge tickets198 t21.004'158.00
Backfill and compaction, by measured quantity42 m³38.001'596.00
Daywork: hand digging around utility lines, as per daily report no. 35 h92.00460.00
Subtotal10'929.00
VAT 8.1%885.25
Total incl. VAT11'814.25
Less interim invoice no. 1 (paid, incl. VAT)−5'000.00
Balance due6'814.25

What site managers and clients look for:

  • Site and project in the heading (plot, street, client), plus the order or contract number
  • Period of the work, with a reference to the signed daily reports and the measured quantities
  • Machine with weight class, with or without operator, attachments listed separately
  • Tipping and haulage with quantity (t, m³, loads) and receipt, not as a round lump sum
  • Required details under Art. 26 para. 2 VAT Act: name, town, VAT number, client, service, amount, VAT rate and VAT amount
  • Paid interim invoices deducted with number and date

How to deduct earlier payments on the final invoice is covered in the guide to the deposit invoice.

The machine runs, the money doesn't.

You pay for diesel, tipping and haulage straight away. Your money only comes once the report, the quantities and the invoice are on the site manager's desk.

📋

Daywork without signature

Extra digging, rock, dewatering: without a signed daily report, every hour of daywork gets argued over
⚖️

Tipping paid upfront

Weighbridge tickets sit in the cab, the tip's invoice arrives at month end, and it is passed on too late
🚜

Hire not invoiced

The mini digger is long back in the yard, but nobody has billed the hire days, delivery or diesel
From report to payment

Hours, quantities, interim invoices

As software for small construction firms, Magic Heidi covers the invoicing side: on your phone in the cab, on the laptop in the office.

Digger hours and quantities

You enter machine hours with date, from–to and rate. Measured quantities appear on the invoice as quantity times unit price.

  • One hourly item per machine and weight class
  • Sections for excavation, haulage, tipping and daywork
  • Invoice stays a draft until the stage is finished
  • Signed daily reports stored as files with the client

Interim and final invoices

On longer jobs you issue deposit or partial invoices as work progresses instead of financing everything yourself.

  • Quote to invoice in one click
  • Interim invoice as a percentage of the contract sum
  • Final invoice with paid interim invoices deducted
  • Retention as its own deduction line, if agreed

Rental, skips, recycling

Hire days, skip placements and scrap metal deliveries by weight are billed with saved items.

  • Daily, weekend and weekly hire as items
  • Monthly recurring invoice for long-term hire
  • Weighbridge tickets and tip receipts via AI receipt scanning
  • Automatic payment reminders for overdue invoices

Rules for excavation, demolition and equipment rental

Excavator work: costing the hourly rate correctly

There is no official rate for excavator hours. Your hourly rate has two parts. The machine: depreciation, interest, insurance, servicing, wear parts and diesel, divided by the hours it actually works in a year. The operator: wage, social security contributions and unproductive time. The lower the utilisation, the higher the rate you need. Delivery and collection, and attachments such as a breaker or sorting grab, go on the invoice as separate lines.

Excavation cost per m³: billing by measured quantity

With measured quantities (Ausmass), you agree a unit price per m³, m² or linear metre and bill the quantity actually done. State in the quote whether volume is measured in place (undisturbed ground) or loose (on the tipper), and have the site manager countersign the measurements. If no fixed price is agreed, you are paid according to the value of the work and your expenses (Art. 374 Swiss Code of Obligations, CO). A fixed price, on the other hand, binds you even if the ground is harder than expected (Art. 373 CO).

Tipping, haulage and excavated material

Construction waste must be separated on site, and clean excavated material kept as unmixed as possible (Art. 17 of the Waste Ordinance, VVEA/OLED). It must be recovered as fully as possible, for example as building material or for backfilling (Art. 19 VVEA). Tipping fees and haulage that you pass on are part of the price and therefore of the VAT base, even if you show them separately (Art. 24 para. 1 VAT Act). Bill them per tonne as per the weighbridge ticket.

Interim invoices and retention

Without an agreement, payment is only due on handover (Art. 372 CO). So interim payments as work progresses and a retention until acceptance only apply if they are in the contract. The SIA 118 standard is a private set of rules and only applies if you expressly make it part of the contract. If an invoice stays unpaid, you can have a builder's lien (Bauhandwerkerpfandrecht) registered, no later than four months after the work is completed (Art. 839 para. 2 Swiss Civil Code). More on the deposit invoice.

Renting out diggers: VAT and net tax rate

The law provides no reduced rate for machine hire (Art. 25 para. 2 VAT Act), so the standard rate of 8.1% applies. You must register for VAT (MWST/TVA) from CHF 100'000 annual turnover (Art. 10 para. 2 let. a VAT Act). The official net tax rates (Federal Tax Administration ordinance, as at 1.1.2025):

ActivityNet tax rate
Excavation firms4.5%
Earthmoving (loader) firms4.5%
Demolition firms4.5%
Building and civil engineering firms4.5%
Machinery: hire with or without operator3.7%
Construction machinery and equipment: trade1.3%
Labour-only work in construction6.8%

Since 2025, every activity with more than 10% of turnover gets its own rate (Art. 86 VAT Ordinance). If you buy expensive machines, you have a lot of input tax, so compare the effective method with your accountant. More in VAT for freelancers.

National collective agreement (LMV) and training for machine operators

According to SECO, the national collective agreement for the main construction trade (Landesmantelvertrag, LMV; CN in French) is generally binding until 31.12.2031, except in parts of the cantons of Geneva and Vaud. It covers employers whose main activity is civil engineering, road building, excavation, demolition, or the storage and recycling of excavated and demolition material. There is no federal excavator licence. According to Suva, however, anyone operating construction machinery with a driver's seat needs training under Art. 8 of the Accident Prevention Ordinance (VUV/OPA), whatever the weight of the machine, and the employer documents it. The cantons of VS, VD, GE and NE have additional rules.

What Magic Heidi is for, and what it is not

Magic Heidi fits excavation contractors, small civil engineering and demolition firms, skip hire services and construction equipment rental businesses that want to handle quotes, daywork and quantity invoices, interim invoices, hire invoices, receipts and VAT without office staff. Not included: NPK bills of quantities and costing, quantity take-off software, a site diary signed on a tablet, rental fleet management with availability calendar and bookings, weighbridge integration, purchase credit notes at daily prices for the scrap metal trade and payroll under the LMV. You keep daily reports on paper or in your report app and store them in Magic Heidi with the client. If you price public tenders to NPK, run large sites with full construction administration or dispatch a rental fleet of dozens of machines, construction or rental software is the better choice.

Reviews

What builders and freelancers say about Magic Heidi

4.8 out of 5 from over 200 public reviews.

★★★★★
“Tried lots of tools and ended up sticking with Magic Heidi. Convincing throughout, and easy and intuitive to use. Very happy.”
masc888App Store review · translated from German
★★★★★
“The first program that’s truly easy to use, even for office-challenged construction guys like me. The most user-friendly thing I’ve ever tried, and I bought it right away!”
Andy FischerGoogle review · Construction · translated from German
★★★★★
“Since we started using Magic Heidi for our company in Geneva, invoicing has become child’s play. The interface is clear, intuitive and perfectly suited to Swiss requirements (VAT, currencies, addresses, etc.). Invoice customisation, payment tracking and automatic reminders save us several hours a week.”
Valentin BernardGoogle review · Company in Geneva · translated from French

Try it free, then decide

All prices incl. VAT. Cancel any time.

Free

CHF 0/ month
Free forever
  • 3 invoices & 3 receipts (in total)
  • All features unlocked
  • No credit card needed
Start for free

Monthly

CHF 39/ month
Cancel monthly
  • Same features
  • Unlimited invoices & receipts
  • Cancel any time
Start monthly

30-day money-back guarantee. No lock-in.

FAQ

Questions from excavation and rental

Which software suits a small excavation or digger business?

For excavation contractors and small civil engineering firms that mainly bill daywork, measured quantities and smaller contracts, invoicing software with quotes, interim invoices, QR-bill, receipt scanning and VAT is enough, Magic Heidi for example. If you price NPK bills of quantities or need a site diary or rental fleet management, take construction or rental software. You can try Magic Heidi with 3 free invoices; more on the invoicing software page.

What does an hour of excavator work with operator cost, and how do I bill it?

There is no official rate; every business works out its own. The rate covers the machine (depreciation, interest, insurance, servicing, wear, diesel, divided by working hours per year) and the operator (wage, social security contributions, unproductive time). The invoice shows the machine and weight class, the hours as per the daily report and the rate. Delivery and collection, and attachments, are separate lines.

How do I bill excavation by measured quantity (m³)?

You agree a unit price per m³ and bill the quantity actually done, measured together with the site manager. Set out in the quote whether volume is measured in place or loose, and what the price includes: loading, haulage, tipping. In Magic Heidi the line appears on the invoice as quantity times unit price, and you write the unit in the line text. You store the signed measurements as a file with the client.

How do I issue interim invoices, and how does retention work?

Both must be agreed in the contract, because without an agreement payment is only due on handover (Art. 372 CO). You issue interim invoices as work progresses; in Magic Heidi as a percentage of the contract sum with a QR-bill. A retention is a contractually agreed part of the price that the client holds back until acceptance or until a period ends. On the final invoice you deduct the paid interim invoices and the retention as separate lines, and invoice the retention separately later. More in the guide to the deposit invoice.

How do I invoice mini digger hire (daily rate, deposit, delivery)?

The hire invoice shows the machine and weight class, hire period with handover and return, daily or weekend rate, delivery and collection, attachments, diesel and cleaning as used. Machine hire is subject to the standard VAT rate of 8.1%. You set the security deposit in the rental agreement and settle it on return; how to book it is a question for your accountant. In Magic Heidi you save your hire rates as items, and for long-term hire a recurring invoice runs each month.

How do I pass on tipping fees and disposal costs?

As a separate line per tonne as per the weighbridge ticket, split by material, plus haulage by load or by hour. Costs you pass on are part of the price and subject to VAT, even if you show them separately (Art. 24 para. 1 VAT Act). Photograph the tip's receipts with AI receipt scanning, so cost and input tax are recorded before the weighbridge ticket goes missing.

How do I keep daily reports that the site manager signs?

A daily report states the site, date, staff, machines with hours, materials and loads, and anything unusual, and the site manager signs it the same day. For daywork it is your proof. Magic Heidi is not a reporting tool: you keep the report on paper or in a report app, transfer the hours to the draft invoice and store the signed report as a file with the client. A template is in the timesheet template.

Does the national construction agreement (LMV) apply to my business?

According to SECO, the national collective agreement for the main construction trade is generally binding until 31.12.2031, except in parts of the cantons of Geneva and Vaud. It covers employers whose main activity includes civil engineering, road building, excavation, demolition, or the storage and recycling of excavated and demolition material. Check with the relevant joint committee (paritätische Kommission) whether your business is covered. You run payroll under the LMV in payroll software, not in Magic Heidi.

What training do I need to operate an excavator?

There is no federal construction machine operator licence. According to Suva, however, anyone operating construction machinery with a driver's seat needs training under Art. 8 VUV, whatever the weight of the machine, and the employer must document it. The K-BMF course ends with a machine operator certificate per machine category. The cantons of VS, VD, GE and NE have additional rules.

Can I invoice in English?

Yes. Quotes and invoices can be in English, and also in German, French, Italian or Romansh, so a site manager in Zurich or a client in Lausanne gets a document in their language. The QR-bill payment part is the standard Swiss slip in every language.

How much does invoicing software for a construction firm cost?

Magic Heidi is free for your first 3 invoices and 3 receipts, with no credit card. After that it costs CHF 24.90 a month on the yearly plan (CHF 299 a year) or CHF 39 monthly, incl. VAT and with unlimited team access for the office, site foreman and accountant. The yearly and monthly plans have the same features. Details on pricing.

Invoice sent before the digger cools

Try Magic Heidi with 3 invoices and 3 receipts free, no credit card. Your site foreman and your accountant work with you at no extra cost.